6-61
TM 55-2840-231-23
6-25. Accumulator - Removal - Continued
ENGINE/ - Continued
11. Preformed packing
(12)
Do not torque through the
double check valve at any time.
When the double check valve
is removed use extreme care
to prevent foreign materials
from entering the pneumatic
lines or the double check valve.
Discard.