TM 55-2840-231-23
6-26. Accumulator - Installation
INITIAL SETUP
Applicable Configuration
References
All
Para 6-3
ENGINE/
1. New preformed
packing (11)
2. Double check
valve (10)
3. Double check
valve (10)
4. New preformed
packing (9)
5. Union (8) and
elbow (7)
6. Check valve (10)
7. Clamp (12) and
nut (14)
6-62
NOTE
Do not lubricate preformed
packing.
NOTE
Do not lubricate preformed
packing.
Place on accumulator
(13).
Screw on accumulator
(13). Hold accumula-
tor with backup
wrench.
Tighten 55-80 in. lb
(0.6-0.9 kg/m) by
turning on the hexagonal
surface of the check
valve adjacent to the
accumulator.
Place on union (8).
Screw on check valve
(10).
Hold with backup
wrench on hexagonal
surface adjacent to
union and tighten union
55-80 in. lb (0.6-0.9
kg/m).
At this point it may be
necessary to loosen in
order to align assembly.