TM55-2840-251-23
Section V POWER TURBINE GOVERNOR
9-5
POWER TURBINE GOVERNOR
This task covers:
a.
Inspection (9-5-1)
c.
Removal (9-5-3)
b.
Adjustment (9-5-2)
d.
Installation (9-5-4)
INITIAL SETUP
Applicable Configurations:
All
Tools:
Powerplant Mechanic's Tool Kit
NSN 5180-00-323-4944
Torque Wrench (0 to 100 inch-
pounds)
Materials:
Lockwire (E.5)
Plastilube No. 3 Grease (E.22)
Parts:
Gasket
Packing
Cotterpin
Personnel Required:
68B Powerplant Mechanic
66G Aircraft Inspector
References:
TM55-2840-251-23P
9-5-1 INSPECTION
1.
Inspect for obvious leaks and damage.
2.
Replace if defects found.
9-5-2 ADJUSTMENT
Refer to Chapter 1, Section X.
GO TO NEXT PAGE
9-19