(5)
TOOLS
AND
EQUIPMENT
(3)
MAINTENANCE
FUNCTION
(6)
REMARKS
(2)
COMPONENT
ASSEMBLY
(1)
GROUP
NUMBER
AVUM
AVIM
DEPOT
(4)
MAINTENANCE CATEGORY
TM 55-2840-251-23
APPENDIX B
Section II
MAINTENANCE ALLOCATION CHART
040904
Power Turbine
Inspect
-.-
60
Governor
Adjust
-.-
60,62
Remove/
-.-
60,62
Install
Overhaul
-.-
0410
Miscellaneous
Equipment
041001
Tachometer
Inspect
-.-
60
Generator
Remove/
-.-
60,62
Install
041002
Fireseal Mount
Inspect
-.-
60
Rings
Remove/
-.-
60,62
Install
Repair
-.-
60,62
041003
Propeller
Inspect
-.-
60
Reversing
Mechanism
Adjust
-.-
60,62
Repair
-.-
60,62
041004
Air Lines and
Inspect
-.-
60
Fittings
Remove/
-.-
60,62
Install
Repair
-.-
60,62
041005
P3 Air Filter
Inspect
-.-
60
Element
Service
-.-
60
Remove/
-.-
60,62
Install
B-17/(B-18 blank)