TM 55-2840-254-23
4-29 INSPECT THIRD TURBINE NOZZLE AND SUPPORT (AVIM) (Continued)
4-29
d. Inspect inner shroud (14). There shall be
no more than one crack (15) from each vane
leading edge slot (16) to braze line (17).
e. Inspect forward support (18). There shall
be no cracks
f. Inspect 16 rivets (19). There shall no? be
more than 40 percent missing material (20).
GO TO NEXT PAGE
4-134
Change 2