TM 55-2840-254-23
4-40
INSTALL NO. 4 AND 5 BEARING PACKAGE SEALS (AVIM) (Continued)
4-40
FOLLOW-ON MAINTENANCE
Assemble Combustion Section and Power
Turbine (Task 3-7).
Install Combustion Section and Power Turbine
(Task 3-8).
Service Engine Oil System (Task 1-74).
END OF TASK
4-244