• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
EMERGENCY PROCEDURES
ENGINE RESTART DURING FLIGHT (NOT USING STARTER)

Operator and Crewmember Checklist C-12V Aircraft
Page Navigation
  12    13    14    15    16  17  18    19    20    21    22  
img
TM 1-1510-254-CL
6. LDG GEAR CONTROL -- As required.
7. FLAPS -- As required.
8. POWER -- Set for single-engine cruise.
9. Engine cleanup checklist -- Perform.
ENGINE MALFUNCTION DURING
FINAL APPROACH
1. POWER -- As required.
2. LDG GEAR CONTROL -- Recheck DN.
ENGINE MALFUNCTION (SECOND
ENGINE)
1. Airspeed -- As required.
2. POWER lever -- IDLE.
3. PROP lever -- As required.
4. Conduct engine restart procedure if time
permits.
MAXIMUM GLIDE
1. LDG GEAR CONTROL -- UP.
2. FLAPS -- UP.
3. PROP levers -- Feather.
4. Airspeed -- As required.
ENGINE SHUTDOWN IN FLIGHT
1. POWER lever -- IDLE.
2. PROP lever -- FEATHER.
3. CONDITION lever -- FUEL CUTOFF.
4. TCAS -- Set TA.
5. Engine Cleanup checklist -- Perform.
ENGINE CLEANUP
1. CONDITION lever -- FUEL CUTOFF.
2. PROP lever (affected engine) --
FEATHER.
3. ENG AUTO IGN -- OFF.
E-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.