TM 1-1520-264-23
4.26.3.6
Inspection Procedure. Refer to Eddy Current Method, paragraph 1.4.11 and Figure 4-26.
a.
Place probe on a good area in the inspection location and null. Adjust phase as required to obtain horizontal
lift-off.
b.
Inspect the part.
c.
Any signal similar to the notches in the test block is cause for rejection.
NOTE
Either probe identified in paragraph 4.26.3.1 may be used depending primarily on the
ease of accessibility and user friendliness. If the-probes are changed, steps 4.26.3.5 b.
(1), (2), and (3) shall be repeated each time a change is made.
4.26.3.7
Marking and Recording of Inspection Results. Mark and record the inspection results as required by
paragraph 1.3.
4.26.4
Backup Method. None required.
4.26.5
System Securing. The main landing gear wheel assembly requires assembly and installation in accordance
with the applicable technical manuals listed in Table 1-1.
Figure 4-26.
Main Landing Gear Wheels
4-61