TM 1-1520-264-23
6.3.3.5 NDI Equipment Settings.
a.
Make the following initial settings on the Eddy Current Inspection Unit, NORTEC-19e
11.
Frequency F1
- 200 KHz
F2
- off
HdB
- 57.0
VdB
- 69.0
Rot
- 56
Probe drive
- mid
LPF
- 100
HPF
- 0
H Pos
- 80%
V Pos
- 20%
b.
Refer to Eddy Current Method, paragraph 1.4.11. Setup on test block as follows:
(1)
Null probe on test block.
(2)
Adjust phase as required to obtain horizontal lift-off.
(3)
Move probe over all three notches in test block. Adjust gain to obtain a three block vertical signal when
probe is passed over 0.040-inch notch in test block. (See the standard instrument display shown in
Figure 1-7.)
6.3.3.6 Inspection Procedure. Refer to Eddy Current Method, paragraph 1.4.11 and Figure 6-3.
Figure 6-3. Main Rotor Swashplate Shoulder Pin Mating Bores
6-8