TM 1-4920-449-13&P
d. Removing Counterbalance Cables
1. After shop erection is complete (AND COUN-
TERBALANCE CABLES ARE SECURED), remove
three screws (1) from cable retainer block (2).
2. Let cable (3) and retainer block (2) hang loose
next to shelter.
3. Install retainer block screws (1) and secure.
4. Repeat 1,2, and 3 above for remaining cable.
e. Shop is now ready for positioning of equipment
to operational mode.
2-4