Seq.
Procedures
No.
Item to be inspected
(inspect for)
P
C
4.
SDU-5E
distress
Cracks in case; inspect
in
X
marker light and flash
accordance with TM 55-1680-322-12
guard
5.
Signaling mirror
Scratches,
chipped,
cracks,
X
distortion;
illegible
operating
instructions;
broken or missing
lanyard
6.
Flare launcher,
Damage; corrosion; service life;
X
distress signals
spring
tension;
cycle
firing
mechanism. Flare lot number and
date of manufacture.
7