TM55-2840-251-23
SECTION VIII GENERAL MAINTENANCE PROCEDURES (Continued)
1-77
CLEANING (Cont)
3.
Compressor Wash (Cont)
a.
Equipment Required (Cont).
(6)
One pressure gage (O to 100 psi).
(7)
Two air supply valves.
(8)
Two fluid shutoff valves.
(9)
Suitable tubing-connections to be 5/16 inch minimum.
(10)
Two flow control valves for recirculation pump.
b.
Set up wash system as shown.
GO TO NEXT PAGE
1-101