TM 55-2840-254-23
2-80.8 INSTALL HOSE ASSEMBLY (WATER WASH CHECK VALVE ELBOW TO
2-80.8
INTERSTAGE AIR-BLEED ACTUATOR FUEL CONTROL INLET) (Continued)
1. Install hose assembly (1) on check valve elbow
(2) and air-bleed actuator Pm inlet tee (3).
INSPECT
FOLLOW-ON MAINTENANCE:
None
END OF TASK
Change
5
2-556.15