TM 55-2840-254-23
3-7 ASSEMBLE COMBUSTION SECTION AND POWER TURBINE (AVIM) (Continued)
3-7
10. Install fireshield section (Ref. Task 4-19).
11. Install left- and right-hand fuel manifold
assemblies (Ref. Task 6-20).
12. Install fireshield assembly (Ref. Task 4-15).
13. Install left- and right-hand bus bar assemblies
(Ref. Task 4-11).
NOTE
If necessary, use a soft-faced mallet to
align bolt holes.
14. Position exit vane assembly (14) in fourth tur-
bine nozzle (15). Align bolt holes (16).
GO TO NEXT PAGE
3-84