TM 55-2840-254-23
TASK
SECTION
N O .
TITLE
VIII
NO. 4 AND 5 BEARING PACKAGE -MAINTENANCE PROCEDURES
IX
X
XI
4-37
Remove No. 4 and 5 Bearing Package Seals (AVIM)
4-185
4-38
Clean No. 4 and 5 Bearing Package (AVIM)
4-198
4-39
Inspect No. 4 and 5 Bearing Package (AVIM)
4-200
4-40
Install No. 4 and 5 Bearing Package Seals (AVIM)
4-202
4-41
Remove No, 4 and 5 Bearing Oil Tubes (AVIM)
4-245
4-42
Clean No. 4 and 5 Bearing Oil Tubes (AVIM)
4-249
4-43
Inspect No. 4 and 5 Bearing Oil Tubes (AVIM)
4-250
4-44
Install No. 4 and 5 Bearing Oil Tubes (AVIM)
4-252
FOURTH STAGE POWER TURBINE NOZZLE -MAINTENANCE
PROCEDURES
4-45
Remove Fourth Stage Power Turbine Nozzle (AVIM)
4-269
4-46
Clean Fourth Stage Power Turbine Nozzle (AVIM)
4-271
4-47
Inspect Fourth Stage Power Turbine Nozzle (AVIM)
4-273
4-48
Repair Fourth Stage Power Turbine Nozzle (AVIM)
4-280
4-49
Install Fourth Stage Power Turbine Nozzle (AVIM)
4-282
THIRD STAGE POWER TURBINE ROTOR -MAINTENANCE
PROCEDURES
4-50
Clean Third Stage Power Turbine Rotor (AVIM)
4-51
Inspect Third Stage Power Turbine Rotor (AVIM)
4-52
Repair Third Stage Power Turbine Rotor (AVIM)
SECOND TURBINE DISC ASSEMBLY -MAINTENANCE PROCEDURES
4-53
Remove Second Turbine Disc Assembly (AVIM)
4-313
4-54
Clean Second Turbine Disc Assembly (AVIM)
4-320
4-55
Inspect Second Turbine Disc Assembly (AVIM)
4-322
4-56
Install Second Turbine Disc Assembly (AVIM)
4-324
PAGE
4-303
4-305
4-309
4-3
