TM 55-2840-254-23
4-59
INSPECT SECOND TURBINE NOZZLE, SPACER AND CASE (AVIM)
4-59
INITIAL SETUP
Applicable Configurations:
All
Tools:
Technical Inspection Tool Kit,
NSN 5180-00-323-5114
Materials:
None
Personnel Required:
68B30 Aircraft Powerplant Inspector
Equipment Condition:
Off Engine Task
1. Inspect forward side of second turbine nozzle
(1) as follows:
a. Inspect welded joint (2) and inner shroud to
support brazement (3). There shall be no
cracks (4) or voids (5).
GO TO NEXT PAGE
4-347