TM 55-2840-254-23
4-71 INSTALL FIRST TURBINE NOZZLE (AVIM) (Continued)
4-71
6. Install baffle retainer (11) on baffle (5). Apply
anti-seize compound (E5) on 18 bolts (12).
7. Install 18 bolts (12). Lockwire bolts 112). Use
lockwire (E29).
INSPECT
FOLLOW-ON MAINTENANCE
Install First Turbine Disc Assembly (Task 4-66).
Install Second Turbine Nozzle, Spacer, and
Case (Task 4-61).
Install Second Turbine Disc Assembly (Task
4-56).
Install Combustion Section and Power Turbine
(Task 3-8)
Service Engine Oil System (Task 1-74).
END OF TASK
4-467/(4-468 blank)