TM 55-2840-254-23
5-7 INSTALL ACCESSORY GEARBOX ASSEMBLY (Continued)
5-7
FOLLOW-ON MAINTENANCE:
install Fuel Control (Task 6-6).
Install Main Oil Pump and Scavenge Oil Screen
(Task 8-4).
Install Tube Assembly (Inlet Housing to Main
Oil Pump) (Task 8-51).
Install Fuel Boost Pump Assembly (Task 6-13).
Service Engine Oil System (Task 1-74).
END OF TASK
5-44