TM 55-4920-428-13
b. Packaging. Place styrofoam cushioning material around each unit.
c. Packing. Place each unit into a cleated plywood box.
5-53. Preparation for Storage.
No special preparations are required before storing the test set. Refer to table 1-1 and 1-2 to be certain
that the test set is complete before closing the covers and storing the units. The unit should be stored in
a clean dry area.
5-54. Preparation for Shipment.
Prepare the test set for shipment as follows:
a. Disconnect and secure loose components. (Ref para 2-12.)
b. Refer to tables 1-1 and 1-2 to be certain that the test set is complete.
C. Place the cover on each unit. Secure the four latches on the electrical unit. Secure the six latches on
the hydraulic unit. Pack the unit. (Ref para 5-51.) The equipment is now ready for shipment.
5-20