TM 1-1510-254-CL
b. Flap setting.
c. Set REFS.(Page N-8).
d. V1/Vr/V2.
e. ACC/STOP.
ARRIVAL BRIEFING
1. Weather/altimeter setting.
2. Airield/facilities -- Review.
a. Field elevation.
b. Runway length.
c. Runway condition.
3. Approach procedure -- Review.
a. Approach plan/proile.
b. PFD/ESIS -- Set.
c. Altitude restrictions.
d. Missed approach.
(1) Point.
(2) Time.
(3) Intentions.
(4) NAV Source.
e. Decision height or MDA.
4. Backup approach/frequencies.
5. Copilot duties -- Review.
a. FMS/Nav/comm.set-up.
b. Monitor altitude and airspeeds.
c. Monitor approach.
d. Call out visual/ield in sight.
6. Landing performance data -- Review.
a. Approach speed.
b. Runway required.
7. Passenger brieing -- As required.
P-20 Change 1