TM 1-1510-254-CL
* FIRST ENGINE START (BATTERY START)
1. Exterior LIGHTS -- As required.
3. Engine -- Start.
4. Engine instruments -- Check.
5. CONDITION lever -- HIGH IDLE. Monitor
ITT as CONDITION lever is advanced.
* SECOND ENGINE START (BAT-
TERY START)
1. GENERATOR DC LOAD -- Verify 50% or
less.
3. Engine -- Start.
4. Engine instruments -- Check.
5. CONDITION lever -- HIGH IDLE. Monitor
ITT as CONDITION lever is advanced.
6. Current Limiter -- Check.
ABORT START
1. CONDITION lever -- FUEL CUTOFF.
2. IGNITION AND ENGINE START --
STARTER ONLY.
3. ITT -- Monitor for drop in temperature.
4. IGNITIION AND ENGINE START -- OFF.
ENGINE CLEARING
1. CONDITION lever -- FUEL CUTOFF.
2. IGNITION AND ENGINE START -- OFF (1
minute minimum).
3. IGNITION AND ENGINE START switch --
STARTER ONLY (15 seconds minimum, 40
seconds maximum).
4. IGNITION AND ENGINE START -- OFF.
N-4