TM 1-1520-264-23
3.20.3.5 NDI Equipment Settings.
a.
Make the following initial settings on the Eddy Current Inspection Unit, NORTEC-19eII
Frequency F1
- 200 KHz
F2
-off
HdB
- 57.0
VdB
- 69.0
Rot
- 56
Probe drive
- mid
LPF
- 100
HPF
- 0
H Pos
- 80%
V Pos
- 20%
b.
Refer to Eddy Current Method, paragraph 1.4.11. Set up on test block as follows:
(1)
Null probe on test block.
(2)
Adjust phase as required to obtain horizontal lift-off.
(3) Move probe over all three notches in test block. Adjust gain to obtain a three block vertical signal when
probe is passed over 0.040-inch notch in test block. (See the standard instrument display shown in Figure
1-7.)
3.20.3.6 Inspection Procedure. Refer to Eddy Current Method, paragraph 1.4.11 and Figure 3-20.
a.
Place probe on a good area in the inspection location and null. Adjust phase as required to obtain horizontal
lift-off.
b.
Inspect the part.
c.
Any signal similar to the notches in the test block is cause for rejection.
NOTE
Either probe identified in paragraph 3.20.3.1 may be used depending primarily on the ease of accessibility
and user friendliness. If the probes are changed, steps 3.20.3.5 b. (1), (2), and (3) shall be repeated each
time a change is made.
3.20.3.7 Marking and Recording of Inspection Results. Mark and record the inspection results as required by paragraph
1.3.
3.20.4
Backup Method. Fluorescent Penetrant, refer to paragraph 1.4.7.
3.20.5
System Securing. The intermediate gearbox retainers, if removed, require installation in accordance with the
applicable technical manuals listed in Table 1-1.
3-46