TM 1-1520-264-23
Figure 4-30.
Main Landing Gear Trailing Arm Cross Tube
a.
Select AC on the AC/DC power switch.
b.
Place probe/yoke on part in position 1 as shown.
c.
Press the test switch and apply a light coat of magnetic particle media at the same time. Remove the media
momentarily before removing the current. Current should be applied for no more than five seconds.
d.
Inspect for cracks using the black light.
e.
Demagnetize before moving to the next position. Refer to paragraph 4.30.3.8.
f.
Repeat steps a. through e. for position 2.
4.30.3.7
Marking and Recording of Inspection Results. Mark and record the nspection results as required by
paragraph 1.3.
4.30.3.8
Demagnetization. With the switch remaining in the AC position, place the probe/yoke legs in the same
position used for magnetizing. Press the test switch and withdraw the probe/yoke from the part for a distance of two feet
before releasing the switch.
4.30.4
Backup Method. None required.
4.30.5
System Securing. Clean the main landing gear trailing arm cross tube thoroughly to remove all residual
magnetic particle media. Refer to Post Cleaning and Restoration of Part or Area After NDI, paragraph 1.4.16. The main
landing gear trailing arm requires installation in accordance with the applicable technical manuals listed in Table 1-1.
4-69
