TM 1-4920-433-13&P
PNEUDRAULIC SHOP
SHELTER OPENING SEQUENCE
SECURITY MEASURES FOR ELECTRONIC DATA
Not Applicable
SITING REQUIREMENTS
The Pneudraulic Shop should be set up with power cable length, tactical deployment, exhaust/inlet of ECUs, and
phasing between related shops kept in mind. The shop's power entry panel, next to personnel entrance door,
should be facing toward the power source and PDB (see WP 0002 00, Figure 1).
ASSEMBLY AND PREPARATION FOR USE
NOTES
Four personnel are required to perform all of the following procedures.
Each shelter is equipped with six container jacks. Four are ISO jack
assemblies and two are hinged jack assemblies. Four ISO jack assemblies
are used to lift and level shelter. Two hinged jack assemblies are used on the
expanded side to level floor after expansion.
If ground is soft, place wood planks or boards on ground under each shelter
corner before detaching lifting equipment.
1. Remove four ISO jacks (2) from inside of personnel and right cargo doors (1) by turning locking handle (3) to
loosen jack attachment insert (4) and removing safety pin (5).
2. Position ISO jacks at each corner of shelter.