TM 1-4920-436-13&P
ENGINE SHOP
POSITIONING SHOP EQUIPMENT
SAFEGUARDING BOLTS, WASHERS, AND NUTS
The following procedures and recommended sequence for moving equipment shall be observed. New positions in
which equipment will be located on expanded half of shelter are identified.
CAUTION
Ensure that proper bolts, washers, and nuts are available to secure equipment
when shop is to be transported. Lack of correct hardware could cause extensive
damage to equipment or shelter when shop is moved. All bolts, washers, and
nuts removed from equipment will be collected and placed in cotton mailing bag.
Cotton mailing bag is kept in Shelter BII box for safekeeping until shelter is to be
moved and equipment bolted to floor.
EYEWASH STATION
NOTE
Bolts, washers, and nuts used during installation of eyewash station are in cotton
mailing bag.
1. Obtain eyewash station wall bracket, two bolts (2), two lock washers (3), and two flat washers (4) from
appropriate storage location.
2. On expanded wall, align holes in wall with bracket (1) and install bolts (2), lock washers (3) and flat washers
(4).
3. Torque bolts 160-190 in. lbs.