TM 55-2840-231-23
CHAPTER 3
COMBUSTION SECTION
Combustion Maintenance Procedures and First-Stage Nozzle Shield Inspection
Outer Combustion Case - Inspection
Outer Combustion Case - Weld-Repair (AVIM)
Combustion Liner - Inspection
Combustion Liner - Weld-Repair (AVIM)
Combustion Section - Removal
Combustion Section - Installation
Compressor Discharge Air Tube - Inspection
Compressor Discharge Air Tube - Weld - Repair (AVIM)
Compressor Discharge Air Tube Seal Ring - Inspection
Burner Drain Valve - Removal, Cleaning, Testing, and Installation
3-1
3-1
3-4
3-6
3-10
3-13
3-16
3-23
3-24
3-25
3-26
3-1. COMBUSTION MAINTENANCE PROCEDURES AND FIRST-STAGE
NOZZLE SHIELD INSPECTION
.
Visually inspect all subassemblies and accessories removed from the engines combustion
section. Check for loose or missing parts. Note any damage or excessive wear. Repair
damaged parts where possible. Replace damaged parts that cannot be repaired. Disassembly
procedures provided enable required cleaning, inspection, repair or replacement.
3-2. Outer Combustion Case - Inspection.
INITIAL SETUP
Applicable Configuration
Al
l
References
Para 3-3
Change 13 3-1