TM 55-2840-251-23
SECTION IX PREPARATION FOR STORAGE AND SHIPMENT (Continued)
1-90 INSTALLATION IN CONTAINER
(Cont)
1. Remove nuts (7), washers (8) and cover (9).
2. Depress valve (6) to release air pressure from
container.
3. Remove nuts (3), washers (4) and bolts (5) from
container.
4. Attach sling (T43)(1) and hoist (2) to container cover
(10) lifting points and remove cover.
GO TO NEXT PAGE
1-127