TM55-2840-251-23
Section I LINER ASSEMBLY
3-1 LINER ASSEMBLY (AVIM)
This task covers:
a.
Removal (3-1-1)
c.
Repair (3-1-3)
b.
Inspection (3-1-2)
d.
Installation (3-1-4)
INITIAL SETUP
Applicable Configurations:
All
Tools:
Powerplant Mechanic's Tool Kit
NSN 5180-00-323-4944
Aircraft Inspector's Tool Kit
NSN 5180-00-323-5114
Drill and Brace (1/16 inch)
Materials:
Welding Wire (E.60)
Inert Gas (E.61)
Personnel Required:
68B Powerplant Mechanic
66G Aircraft Inspector
44B Welder
Equipment Condition:
Power Section Removed
(Task 4-1-1)
Fuel Manifold Assembly Removed
(Task 6-5-1)
Glow Plugs Removed (Task 7-1-1)
GO TO NEXT PAGE
3-3