4-7 EXHAUST DUCT (Continued)
4-7-4 INSTALLATION (Cont)
3. Fit lifting bracket (11) and
Cc-/ bolts (6), washers (5) and nuts
(4). Torque nuts to 36 to 40
inch-pounds.
4. Install reversing push pull
cable in or through forward lift-
ing bracket. Attach to reversing
linkage (3.1).
5. Align any dimples in cover
(3) with scallops on shaft
housing and install cover (3) and
spacer (2), if fitted, with bevel
side of spacer facing the bearing
cover.
6. Install ring (1).
7. Install power turbine rotor
air seal (Task 4-4-1).
FOLLOW ON MAINTENANCE:
Installation Power Turbine Shroud
(Task 4-6-3)
Installation Power Turbine Rotor
Assembly (Task 4-4-3)
Installation Power Turbine Stator
Housing (Task 4-2-3)
Installation Power Section
(Task 4-1-2)
END OF TASK