TM 55-2840-254-23
2-30.1 INSTALL RTV IN FIRST STAGE STATOR VANE ASSEMBLY (Continued)
2-30.1
b. Starting with center bolts (6) in torque
bolts (6) first to 45 inch-pounds. Loosen all
bolts and retorque to 15 inch-pounds
using the same order.
c. Check ends of bolts (6). Bolt ends shall be
flush, or not more than 0.035 inch below
surface of stator. If necessary, add wash-
ers under bolt heads. There must be at
least one washer under each bolt head.
d. Calculate gap between stator vane
shrouds as outlined in step 3.
e. Lockwire bolts (6). Use Iockwire (E29).
GO TO NEXT PAGE
2-254.6
Change 5