TM 55-2840-254-23
2-45 INSPECT NO. 2 BEARING PACKAGE (AVIM)
2-45
INITIAL SETUP
Materials:
None
Applicable Configuration:
All
Personnel Required:
68B30 Aircraft Powerplant Inspector
Tools:
Technical Inspection Tool Kit,
Equipment Condition:
NSN 5180-00-323-5114
Off Engine Task
GoggIes
Compressed Air Source
1. Inspect two bearing housing liners (1).
a. There shall be no corrosion or pitting.
b. There shall be no cracks.
c. There shall be no scoring or wear on any area
of the liner outside circumference (2).
2. Inspect two retaining rings (3). There shall be
no cracks or bends.
GO TO NEXT PAGE
2-414