TM 55-2840-254-23
2-72 INSTALL NO. 3 BEARING PACKAGE (AVIM) (Continued)
2-72
13. Pack bearing (16) with shortening compound
(E46) and press rollers (17) forward into
retainer (18).
14. Position No. 3 bearing package (19)
over align-
ment pins (T2) (12). Make sure that notch (20)
is at the 6-oclock position.
GO TO NEXT PAGE
2-520