TM 55-2840-254-23
3-10 ASSEMBLE COMBUSTION SECTION (AVIM) (Continued)
3-10
19. Tighten 28 bolts (19). Torque to 50 to 55
inch-pounds. Lockwire bolts (19). Use
lockwire (E29).
INSPECT
FOLLOW-ON MAINTENANCE:
Assemble Combustion Section and Power
Turbine Task 3-7).
Install Combustion Section and Power Turbine
(Task 3-8).
Service Engine Oil System (Task 1-74).
END OF TASK
Change 4 3-167