TM 55-2840-254-23
4-29
INSPECT THIRD TURBINE NOZZLE AND SUPPORT (AVIM) (Continued)
4-29
g. Inspect four seals (21) as follows:
(1)
(22). shall be no circumferential cracks
2. Inspect aft side of third turbine nozzle (1) as
follows:
a. Inspect outer shroud (23). There shall be no
more than ten cracks (24) from vane trailing
edges (25). These cracks (24) must not be
longer than 1/8 inch.
GO TO NEXT PAGE
4-135