TM 55-2840-264-23
4-29 INSPECTTHIRD TURBINE NOZZLE AND SUPPORT (AVIM) (Continued)
4-29
(2) There shall be no more than 20 cracks (33)
extending from vane slot (34) past aft
edge (35) to braze line (36).
d.
Inspect 16 rivets (38). There shall be no
more than 40 percent of rivet material
missing (39).
GO TO NEXT PAGE
4-138
Change 2