TM 55-2840-254-23
Section VIII. NO. 4 AND 5 BEARING PACKAGE - MAINTENANCE PROCEDURES
4-37
REMOVE NO. 4 AND 5 BEARING PACKAGE SEALS (AVIM)
4-37
INITIAL SETUP
Applicable Configurations:
All
Materials:
Marking Pencil (E34)
Penetrating Oil (E39)
Wiping Rag (E58)
Tools:
Powerplant Mechanics Tool Kit,
NSN 5180-00-323-4944
Torque Fixture (T48)
Seal Removal Tool Set (T49)
Mechanical Puller (T52)
Hydraulic Wheel Puller (T58)
Torque Multiplier (T63)
Third Turbine Rotor Support Block
(Appendix E)
Personnel Required:
68B10 Aircraft Powerplant Repairer (2)
Equipment Condition:
Engine Oil System Drained (Task 1-75)
Combustion Section and Power Turbine
Removed (Task 3-5)
Combustion Section and Power Turbine
Disassembled (Task 3-6)
GO TO NEXT PAGE
4-185