0012 00
TM 1-4920-435-13&P
THROATLESS SHEAR STAND
1. Remove four set screw plugs from floor inserts at transport location (see WP 0002 00, Figure 2).
2. Store plugs in appropriate storage location.
3. Position stand by sliding along floor to transport location.
4. Obtain four bolts (2), four lock washers (3), and four flat washers (4) from appropriate storage location.
5. Align holes in shear stand (1) with floor inserts and install bolts (2), lock washers (3), and flat washers (4).
6. Torque bolts 160-190 in. lbs.
End of Work Package