TM 10-4930-351-14
0044 00
9.
Install cable clamp (4) on fuel solenoid cable.
10. Position decompression lever (3) and install screws (1) and secure nuts (2).
11. Cycle the decompression lever to ensure freedom of movement.
18
19
20
13
21
15
16
17
14
22
1
3
10
2
11
12
9
4
5
7
6
8
END OF WORK PACKAGE
0044 00-2