TM55-2840-251-23
5-3 ACCESSORY GEARBOX (AVIM) (Continued)
5-3-3 INSTALLATION (Cont)
9. Install slotted spacer (40) on long studs at 9 o'clock
position and five plain spacers (40) on remaining long
studs.
10. Install nuts (38) and torque, using Wrench (T.55), to
32 to 36 inch-pounds.
11. Unscrew nut on Puller/Pusher (T.30) and push on
tool handle to engage stubshaft ball (53) with coupling
shaft.
12. Check that ball is engaged, indicated by minimal
end float when tool handle is push-pulled.
Inspect.
GO TO NEXT PAGE
5-20