9-5
POWER TURBINE GOVERNOR (Continued)
9-5-3 REMOVAL
1.
Disconnect tube assembly (1).
2.
Remove cotterpin (2) and discard.
3.
Remove nut (3), washer (4) and bolt (5).
4.
Remove nuts (6), washers (7) and governor (8).
5.
Remove adapter (9) and packing (10). Discard
packing.
9-5-4 INSTALLATION
1.
Lubricate (E.22) packing (10) and install packing
and adapter (9). Torque to 15 to 20 inch-pounds and
lockwire (E.5) adapter.
2.
Lubricate (E.22) drive shaft and install governor
(8).
3.
Install washers (7) and nuts (6). Torque nuts to 75
to 85 inch-pounds.
4.
Connect control rod with bolt (5), washer (4) and
nut (3). Torque nut to 24 to 36 inch-pounds and install
cotterpin (2).
5.
Connect tube assembly (1). Torque to 90 to 100
inch-pounds and lockwire (E.5) tube nut.
FOLLOW ON MAINTENANCE:
Test Engine (Chapter 1, Section X)
END OF TASK
9-20