TM55-2840-251-23
Section III PROPELLER REVERSING GEAR
10-3 PROPELLER REVERSING GEAR
This task covers:
a.
Removal (10-3-1)
c.
Installation (10-3-3)
b.
Inspection (10-3-2)
d.
Adjustment (10-3-4)
INITIAL SETUP
Applicable Configurations:
All
Tools:
Powerplant Mechanic's Tool Kit
NSN 5180-00-323-4944
Torque Wrench (0 to 100 inch-
pounds)
Materials:
Lockwire (E.5)
Molykote G or Z (E.23)
Grease (E.81)
Parts:
Cotterpins
Personnel Required:
68B Powerplant Mechanic
66G Aircraft Inspector
References:
TM55-2840-251-23P
TM55-1510-215-23
GO TO NEXT PAGE
10-7