TM 55-2840-254-23
2-30.1 INSTALL RTV IN FIRST STAGE STATOR VANE ASSEMBLY (Continued)
2-30.1
(23)
(24)
(c) Fill outer shroud (46) splitline
cavities (48) with RTV.
Place compressor housing half (3) in
oven and cure for three hours at 225
degrees F. Ensure compressor housing
is level. If suitable oven is not available,
allow to cure at ambient temperature for
24 hours.
Remove compressor housing from oven
and allow to cool for 1/2 hour.
GO TO NEXT PAGE
2-254.26C h a n g e
5