TM 55-2840-254-23
3-10 ASSEMBLE COMBUSTION SECTION (AVIM)
3-10
INITIAL SETUP
Applicable Configurations:
All
Tools:
Powerplant Mechanics Tool Kit,
NSN 5180-00-323-4944
Technical Inspection Tool Kit,
NSN 5180-00-323-5114
Torque Wrench, 30-150 Inch-Pounds
Torque Wrench, 100-750 Inch-Pounds
Materials:
Anti-Seize Compound (E5)
Lockwire (E29)
Marking Pencil (E34)
Parts:
Gaskets
Washers
Personnel Required:
68B10 Aircraft Powerplant Repairer
68B30 Aircraft Powerplant Inspector
References:
TM 55-2840-254-23P
Task 3-4
1. Apply anti-seize compound (E5) to threads of
eight screws (1). Install four gaskets (2), four
plates (3),and eight screws (1). Lockwire screws
(1). Use lockwire (E29).
2. Install fuel drain valves (Ref. Task 3-4).
GO TO NEXT PAGE
3-157