TM 55-2840-254-23
4-25
INSTALL THERMOCOUPLE HARNESS ASSEMBLIES (AVIM) (Continued)
4-25
FOLLOW-ON MAINTENANCE:
Assemble Combustion Section and Power
Turbine (Task 3-7).
Install Combustion Section and Power Turbine
(Task 3-8).
Service Engine Oil System (Task 1-74).
END OF TASK
4-121/(4-122 blank)