TM 55-2840-254-23
4-32
INSTALL THIRD TURBINE NOZZLE AND SUPPORT (AVIM) (Continued)
4-32
NOTE
Seal ring shall be installed with cham-
fered edge up.
2. Install end of seal ring (4) in groove (2) over ex-
pander spring (1), Keep, feeding seal ring (4) in-
to grove (2) until entire seal ring is seated.
3. Locate 12-oclock position on third turbine noz-
zle and support (5). Small indentation (6) on aft
flange of nozzle (7) is at 12-oclock position.
Mark line (8) on outside of support (3). Use
marking pencil (E34).
GO TO NEXT PAGE
4-145