TM 55-2840-254-23
4-66 INSTALL FIRST TURBINE DISC ASSEMBLY (AVIM) (Continued)
4-66
Make sure handle is fully seated and rat-
chet selector on torque pack is properly
set before applying torque. Rotating
ratchet selector with load on torque
pack can damage unit and injure per-
sonnel. If injury occurs, get medical
attention.
Do not change ratchet selector when
torque load is on torque pack. Damage
to equipment or injury to personnel can
result. If injury occurs, get medical at-
tention.
9. Insert handle (30) in torque multiplier (T63)
(25). Turn handle (30) clockwise. Torque nut
(17) to 375 foot-pounds.
GO TO NEXT PAGE
4-421