TM 55-4920-328-13
Figure 2-3. Grounding of METS Trailers.
(2) Connect cable W8 from connector J10 on the
control cab rear connector plate to the fuel system OSG
bleed band.
3) Connect cable W9 from connector J11 on the
control cab rear connector plate to the fuel system fuel
flowmeter pickup.
(4) Connect cable W10 from connector J12 on the
control cab rear connector plate to the fuel system fuel
inlet thermocouple,
(5) Connect branched cable W11 from connector
J7 on the test trailer bulkhead box assembly (3) to the
low pressure switch (10) and low flow switch (11) in the
portable lube oil system. This connection is not required
when testing the T700 engine.
(6) Connect cable W13 from connector J6 on the
test trailer bulkhead box assembly to the oil quantity
probe (6) in the engine oil system. This connection is
not required when testing the T700 engine.
(7) Connect branched cable W14 from connector
J8 on the test trailer bulkhead box assembly to the high
power engine water flow switch (4)
and the low power engine water flow switch (5) in the
water system.
(8) Connect cable W15 from connector J5 on the
test trailer bulkhead box assembly to the fuel system
main fuel solenoid.
(9) Connect branched cable W18 from connector
J3 on the test trailer bulkhead box assembly to
connector J1 on the electrec start system and to the
hydraulic start system.
(10) Connect cable W30 from connector J1 on the
test trailer main power interface plate (2) to connector
J1 on the power distribution box on the auxiliary trailer.
(11) Connect cable W29 from connector J2 on the
test trailer power interface plate to the generator set on
the auxiliary trailer.
(12) Connect cable W28 from connector J3 on the
test trailer power interface plate to the generator set on
the auxiliary trailer.
(13) Connect cable W31 from connector J4 on the
test trailer power interface plate to connector J2 on the
power distribution box on the auxiliary trailer.
Change 2 2-9