TM 55-4920-328-13
Table 2-7. T53 Turboshaft Hose and Cable Connections.
CONNECTION
POINT
DESCRIPTION
ENGINE/POWER ABSORPTION
(FIGURE 2-14
PART NUMBER
SYSTEM CONNECTION
(FIGURE 2-15)
1
Bleed Band
Bleed Band
J11
Cable Assembly,
LTCT21340-01
2
Vibration Cable
P2 to Inlet Housing
J9
Assembly
Vibration Pickup
LTCT21339-01
3
P3 to Combustion Chamber
Vibration Pickup
(T53-L-13, L-13A Only)
4
P4 to Combustor Diffuser
Vibration Pickup
5
P3 to Power Turbine Screen
Housing Vibration Pickup
(All Models Except T53-L-13,
L-13A)
6
Thermocouple
J5 to Bellmouth Ambient
J16
Cable Assembly
Thermocouple
LTCT21341-01
7
J13 to Engine Oil Supply
Thermocouple
8
J11 to No. 2 Bearing Oil
Scavenge Thermocouple
9
J10 to Power Turbine Bearing
Oil Scavenge Thermocouple
2-68