TM 10-4930-351-14
0109 00
INSTALL GATES, SHROUD AND OIL COOLER (Refer to Figure 31.)
INITIAL SET-UP:
Tools:
Materials/Parts Required:
Wrench, combination, 6 mm
Oil, Lubricating, Engine, 2 quarts
Wrench, combination, 1/4 in.
Socket, socket wrench, 5 mm
Key, socket head wrench, 5 mm
Screwdriver, cross tip, #2
Equipment Condition:
Oil pan and oil filter installed
Combination wrench, 19 mm
Starter installed
Combination wrench, 13 mm
Socket, socket wrench, deep well, 5 mm
Socket, socket wrench, deep well, 13 mm
Extension, Socket Wrench, 3/8 in. drive, 3 in.
1.
From fuel injector side of engine, insert tie rod (1) between cylinders, hooking tie rod to the two inboard cylinder head
studs.
2.
Install nut (2) and washer (3) attaching gate (4) to tie rod.
NOTE
Fuel supply line from fuel feed pump to injection pumps, fuel return line and fuel solenoid wires
will have to be fed through gate. They may have been connected in a previous procedure.
Disconnect and reconnect after installing gate.
3.
Install the two bolts (5) and washers (6) attaching gate (7). Feed fuel lines from injection pumps through lower hole in
gate (7).
4.
Position oil cooler (8) between crankcase and the fuel lines from injection pumps to the fuel injectors.
5.
Install socket head cap screw (9) and washer (10) attaching oil cooler to gate (7).
6.
Install two cross tip screws (11) attaching gate (12) and bracket (13) to cylinder head.
7.
Install union bolt (14), union (15), washer (16) and spacer (17) connecting the oil supply line at the oil cooler.
8.
Install union bolt (18), union (19), washer (20) and spacer (21) connecting the oil return line at the oil cooler.
9.
Install oil return line (22) to union (23) on crankcase.
10. Install union bolt (24), washer (25), washer (26) and union (27) to connect oil supply line to crankcase.
11. Position shroud (28) onto engine.
0109 00-42