TM 55-2840-231-23
2-7.
Compressor - Preparation for Storage and Shipment
INITIAL SETUP
Applicable Configuration
Consumable Materials
All
Drycleaning Solvent (item 1, Appendix D)
Lubricating Oil (item 5, Appendix D)
Water-Vapor-Proof Bag (item 2, Appendix D)
Desiccant (item 8, Appendix D)
Barrier Material (item 2, Appendix D)
Cushioning Material (item 12, Appendix D)
Cleated Plywood Box (item 46, Appendix D)
Dehydrating Agent (item 8, Appendix D)
References
Para 1-39, 2-11, 2-17, 2-20
The compressor assembly will be prepared
for storage and shipment in accordance with
the following instructions. These instructions
are based on the assumption that the assembly
will be stored or in transit or both for an
indefinite period. Compression assemblies
that are to be stored at an AVIM level for
short periods of time, and no metal shipping
or storage container is available, will be pre-
pared for storage in accordance with action
item 1 below. The compressor will then be
stored in a clean dry area.
STORAGE AND
SHIPMENT/
The procedure prescribed for the
removal of the compressor from
the container is listed in paragraph
2-20.
1. Preparation of
Compressor
Prepare the compressor
assembly for installation
in the metal shipping and
storage container, MS
63054-3, as follows:
2-26